Rare Element Resources
Bear Lodge Project
Canadian NI 43-101 Technical Report
October 9
th
, 2014
10135-200-46 – Rev. 0
10-3
Table 10.2 - Rare Element REE Drilling
Rare Element Resources
Dates
Number of
Drill Holes
Total
Footage
Number of
Assay Intervals
Exploration
2004
3
3,248
(990m)
36
2005
2
2,174
(663m)
11
2007
3
3,057
(932m)
58
2008
4
4,840
(1,476m)
77
2009
20
15,388
(4,691m)
1,635
2010
63
42,409
(12,930m)
4,361
2011
63
48,474
(14,779m)
3,024*
2012***
(Core)
68
57,419.5
(17,506m)
5,700
2012 ****
(RC)
42
24,805
(7,562.5m)
2,481
Exploration Drilling Total
2013
(core)
35
22,348
3,004
2013 (RC)
6
2,730
442
309
226,892.5
(69,174.5m)
20,829
Bulk Sample/Metallurgy
**
2010
40
3,870
(1,180m)
2011
38
5,821.5
(1,775m)
2012
14
6,853.5
(2,089m)
Bulk Sample Drilling Total
92
16,545.5
(5,044m)
(John Ray, Rare Element, 2013)
*assays completed for less than half of 2011 drill core, at time of January 04, 2012 resource update.
** Drill core utilized for metallurgical testing. See Chapter 13.
***2012 Includes 7 unsplit core holes for geotechnical study
****2012 RC drill holes not included in resource calculations
Rare Element’s initial drill programs focused on the Bull Hill resource. A number of
angle holes were drilled in a variety of generally north-easterly orientations from two