NI43-101Pre-Feasibility Study Report - page 148

Rare Element Resources
Bear Lodge Project
Canadian NI 43-101 Technical Report
October 9
th
, 2014
10135-200-46 – Rev. 0
9-10
2012
82 core holes
57,419.5 feet
(14,719.4m)
Bull Hill, Bull Hill
W, Whitetail Ridge
Definition and infill of Bull Hill, expansion
of Bull Hill W, definition of Whitetail
Ridge, PQ bulk sample core for met tests
Geotechnical core
holes
Bull Hill, Bull Hill
W, Whitetail Ridge
Recommended drilling for slope stability
studies
42 SUN RC holes
24,805 feet
(7,563m)
Pug site, Section
16, Whitetail
Ridge, Taylor,
Carbon
Core twin study and expansion at
Whitetail Ridge, Section 16
condemnation, PUG site condemnation,
exploration at Taylor and Carbon.
2013
14 core holes
11,698 feet
(3566.5m)
Whitetail Ridge
Upgrade significant part of resource to
Indicated category
21 core holes
10,651 feet
(3,247m)
Bull Hill
Infill drilling for better definition of high-
grade dike zone
6 RC holes
2,730 feet
(832.1m)
Bull Hill
Twin select PQ core holes to determine
reliability of RC methodology in FMR ore
zones
(John Ray et al, 2014)
1...,138,139,140,141,142,143,144,145,146,147 149,150,151,152,153,154,155,156,157,158,...587
Powered by FlippingBook