The salaried personnel requirements are distributed as presented in Table 16.6.
Table 16.7 - Salaried Personnel
Category
Number
Mine Superintendent
1
Maintenance Foreman
1
Shift Boss
Maintenance Planner
3
1
Sr. Mine Engineer
1
Ore Control/Geology
2
Surveyor
2
Clerk
2
Security
6
Total
19
(Golder, 2014)
Operating costs were developed using equipment operating costs and consumptions,
and associated labor costs on an annual basis. The total mining operating cost thus
varies on an annual basis, but averages $4.42 per ton of material mined. (Refer to
Chapter 21 – Capital and Operating Costs for more details on the capital and
operating costs.)