18.1.5 Water Supply Facilities (Phase 1)
Water to the PUG plant and the Mine facilities will be provided by wells located
approximately 1,500 ft. (457.3 m) from the PUG site. A pump house will host the
pumps, valves, emergency generator, and auxiliaries at the well. One HDPE waterline
from the pump house will supply water to the water tank, located on a hill southwest
of the Mobile Equipment Maintenance Shop building. The water tank will feed by
gravity the PUG plant and the Mine facilities.
18.1.6 Waste Management (Phase 1)
Solid waste generated by the mine will be stored in portable bulk refuse containers
and transferred to the Sundance or Upton municipal solid waste transfer facility.