PUG Plant Process Water
A process water tank of 30,300 gallons (114.7 m
3
) will be installed at the PUG to
supply process water as required. The process water tank will be supplied from
the PUG Thickener overflow and from raw water make-up.
Hydromet Plant Water Supply Facilities
Process Water/Gland Seal, Water/Potable and Water/Fire Water will be directly
connected to the city of Upton, WY water supply.
Compressed Air Supply Facilities
17.6.2
Physical Upgrade Plant
Compressed air will be provided by three rotary screw compressors, two in
operation and one on stand-by. The compressed air package will also include two
receivers, one for plant air, one for dry instrument air, and one heatless desiccant
air dryer.
Hydromet Plant
Compressed air will be provided by three rotary screw compressors, two in
operation and one on stand-by. The compressed air package will also include two
receivers, one for plant air, one for dry instrument air, and two heatless desiccant
air dryers.