15.3 Mineral Reserve Statement
Table 15.3 summarizes the estimated mineral reserves for the Bear Lodge Project,
which are based on the criteria and pit design discussed within this section. The
effective date of the mineral reserve estimate is June 30, 2014. All of the mineral
reserves are included in the estimates of total mineral resources.