Bear Lodge Plan of Operations - page 265

Prefeasibility Access Road Design-Revised
22
Survey Pt
#
Survey Pt
Elev.
Surface
Elev
Region Diff.
Survey Pt
#
Survey Pt
Elev.
Surface
Elev
Region Diff.
137 5819.77 5820.39 CP
-0.62 14195 6191.86 6191.73 Warren
0.13
138 5783.59 5784.49 CP
-0.90 14209 6231.76 6231.74 Warren
0.02
139 5745.14 5746.60 CP
-1.46 14219 6250.62 6250.28 Warren
0.34
140 5731.73 5731.89 CP
-0.16 14242 6319.08 6318.32 Warren
0.76
141 5695.44 5696.54 CP
-1.10 14262 6355.73 6356.63 Warren
-0.90
142 5672.06 5671.57 CP
0.49 14285 6380.00 6376.78 Warren
3.22
144 5664.90 5666.29 CP
-1.39 14305 6383.85 6381.79 Warren
2.06
145 5654.88 5655.47 CP
-0.59 14326 6364.49 6363.17 Warren
1.32
146 5639.98 5641.56 CP
-1.58
6 6390.02 6391.79 CP
-1.77
147 5637.99 5636.56 CP
1.43 15936 6280.15 6281.76 Warren
-1.61
148 5622.82 5621.56 CP
1.26 14335 6252.16 6251.75 Warren
0.41
149 5611.18 5612.08 CP
-0.90 15908 6200.32 6201.63 Warren
-1.31
150 5602.37 5603.96 CP
-1.59 15893 6165.76 6166.72 Warren
-0.96
151 5578.16 5579.10 CP
-0.94 14350 6131.63 6131.94 Warren
-0.31
152 5560.50 5561.64 CP
-1.14 15875 6131.30 6131.94 Warren
-0.64
153 5553.26 5554.50 CP
-1.24 14364 6106.96 6106.78 Warren
0.18
154 5521.12 5521.53 CP
-0.41 15854 6053.26 6054.27 Warren
-1.01
12867 5513.61 5513.25 Miller
0.36 15846 6032.09 6031.68 Warren
0.41
12852 5512.89 5511.53 Miller
1.36 15837 5957.27 5959.04 Warren
-1.77
12820 5494.98 5496.52 Miller
-1.54 15818 5915.97 5916.81 Warren
-0.84
12895 5494.97 5496.52 Miller
-1.55 15796 5830.13 5831.62 Warren
-1.49
12786 5457.92 5460.39 Miller
-2.47 15780 5796.67 5798.36 Warren
-1.69
12928 5457.40 5458.73 Miller
-1.33 14968 5118.08 5116.41 asplt
1.67
12753 5401.82 5403.08 Miller
-1.26 15383 5118.63 5116.41 asplt
2.22
12960 5401.72 5402.88 Miller
-1.16 14604 5118.97 5116.41 asplt
2.56
10877 5352.78 5354.25 Miller
-1.47 15014 5055.17 5054.31 asplt
0.86
12714 5352.57 5353.81 Miller
-1.24 15337 5054.88 5055.79 asplt
-0.91
12715 5354.31 5355.12 Miller
-0.81 14543 5055.16 5056.39 asplt
-1.23
10857 5308.90 5309.80 Miller
-0.90 10344 5327.31 5326.47 Miller
0.84
10890 5304.99 5306.47 Miller
-1.48 11401 5327.27 5326.47 Miller
0.80
12707 5304.72 5306.47 Miller
-1.75 12198 5327.32 5326.47 Miller
0.85
51 5267.97 5269.86 CP
-1.89 12131 5402.35 5402.04 Miller
0.31
12680 5254.39 5254.01 Miller
0.38 11478 5402.82 5403.50 Miller
-0.68
10916 5254.74 5254.93 Miller
-0.19 10279 5403.14 5404.95 Miller
-1.81
10828 5254.21 5255.70 Miller
-1.49 12059 5285.82 5287.92 Miller
-2.10
12646 5230.90 5231.74 Miller
-0.84 11546 5286.16 5288.23 Miller
-2.07
10949 5231.22 5232.57 Miller
-1.35 10201 5284.91 5288.12 Miller
-3.21
10795 5231.21 5233.41 Miller
-2.20 12015 5229.66 5230.22 Miller
-0.56
12612 5228.54 5228.19 Miller
0.35 11590 5230.36 5231.44 Miller
-1.08
10984 5228.55 5228.64 Miller
-0.09 10170 5229.83 5231.44 Miller
-1.61
10762 5227.99 5229.37 Miller
-1.38 11913 5103.18 5103.59 Miller
-0.41
12580 5199.61 5199.21 Miller
0.40 11707 5102.46 5102.23 Miller
0.23
11016 5199.13 5199.52 Miller
-0.39 10081 5101.20 5101.89 Miller
-0.69
10729 5199.54 5200.94 Miller
-1.40
Comparison of Survey Elevations to FUGRO Flight Surface Elevations (cont.)
1...,255,256,257,258,259,260,261,262,263,264 266,267,268,269,270,271,272,273,274,275,...722
Powered by FlippingBook