Bear Lodge Plan of Operations - page 152-153

Table 1
Groundwater Well Sampling Events
Well Name
Well
Description
Number of
Samples
Taken
Through
Mid-
September
2012
Date
Installed
Total
Depth
(ft)
Screened
(ft)
Nov
2010
Dec
2010
Jan
2011
Feb
2011
Mar
2011
Apr
2011
May
2011
Jun
2011
Jul
2011
Aug
2011
Sep
2011
Oct
2011
Nov
2011
Dec
2011
Jan
2012
Feb
2012
Mar
2012
Apr
2012
May
2012
Jun
2012
Jul
2012
Aug
2012
Sep
2012
UMW-01
Bedrock
monitoring
well
1
April
2012
941.0
892.9-
932.9
Not Installed
Not installed
Sample 4/23
Water level
only 4/25
1
1
1
1
2
UMW-02
Bedrock
monitoring
well
1
March
2012
688.0 610-650
Not Installed
Not
installed
Water level
only 4/25
1
1
1
1
1
2
UMW-03
Bedrock
monitoring
well
1
April
2012
860.0 800-840
Not Installed
Not installed
Sample 4/2
Water level
only 4/05,
4/16, 4/21,
4/23, and 4/25
1
1
1
1
2
UMW-04
Bedrock
monitoring
well
1
March
2012
365.0 345-345
Not Installed
Not installed
4/25
1
1
1
1
2
USMW-01
Alluvial
monitoring
well
1
April
2012
8.5
3.5-8.5
Not Installed
Not installed
Water level
only 4/16, 4/21
and 4/25
Sample
5/24
Water level
only 5/21
1
1
1
2
USMW-02
Alluvial
monitoring
well
1
April
2012
19.0
9-19
Not Installed
Not installed
Water level
only 4/16,
4/19, 4/21,
4/23, and 4/25
Sample
5/24
Water level
only 5/21
1
1
1
2
USMW-03
Alluvial
monitoring
well
1
April
2012
17.75
7.75-
17.75
Not Installed
Not installed
Water level
only 4/18,
4/21, 4/23,
and 4/25
Sample
5/24
Water level
only 5/21
1
1
1
2
Notes:
1
Upton sites sampled on a quarterly basis.
2
Sample event and results not confirmed by September 15, 2012
Dates listed correspond to water sample events or water level readings
1...,141,142,143,144,145,146,147,148,149,150 154,155,156-157,158-159,160-161,162-163,164-165,166-167,168,169,...722
Powered by FlippingBook