NI43-101Pre-Feasibility Study Report - page 500-501

18-39
Figure 18.17 - Drawing 09 TSF Staged Construction Plan for Years 17 – 45 (Life of Mine)
(Golder, 2014)
1...,485,486,487,488,489,490-491,492-493,494-495,496-497,498-499 502,503,504,505,506,507,508,509,510,511,...587
Powered by FlippingBook